The scheme involved platform extension on all DLR stations.
The site set up works included grading and levelling of ballast, construction of pedestrian walkways with Type1 material, installation of trackside hoardings during engineering hours.
Access to our work area was restricted due to the nature of the work and the close proximity of the tracks.
Enabling works such as construction of piling mats.